Enecsys Single Repeater Guia de Instalação Página 13

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 12
Installation manual Intelligent Reliable Power
9
© ENECSYS 2010. All rights reserved.
2.3.2 Connect the AC cabling
Connect the AC cable to the mains utility grid, via the appropriate protection devices.
2.4 Performing commmunication checks
At this point the installer ensures that there are sufficient, stable communication links between
the inverters and Gateway and that all inverters are in communication with the Gateway. If there
is an insufficient level of stable communication, depending on the requirement, a Repeater or
Double Repeater is installed.
Note: this completes the physical installation process.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.
This is a note, it
brings to your
attention some
thing which you
may be interested
to know.
Vista de página 12
1 2 ... 8 9 10 11 12 13 14 15 16 17 18 ... 36 37

Comentários a estes Manuais

Sem comentários