Enecsys Single Repeater Informações Técnicas

Consulte online ou descarregue Informações Técnicas para Pontes e repetidores wireless Enecsys Single Repeater. Enecsys Single Repeater System information Manual do Utilizador

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir

Resumo do Conteúdo

Página 1 - Enecsys Enables

www.enecsys.com | [email protected] OPTIMAL SOLAR SOLUTIONSEnecsys Enablesintelligent reliable powerEnecsys AC Module Instruction GuideDocument num

Página 2 - Contents

10 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com3.1. Mounting the gateway•

Página 3

NNN-NNN r001 Enecsys Installation and Operation Guide 113.2.1. Connecting the Gateway to an Ethernet routerConnect one end of the supplie

Página 4 - 1.1. Audience

12 Gateway Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comChapter 4 Using the Enecsys GatewayThe gateway

Página 5 - 1.4. Safety

NNN-NNN r001 Enecsys Gateway Guide 13Step 3. Select country of installationStep 4. Set date and timeSelect installation country and click

Página 6

14 Gateway Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comStep 5. Check that inverters are reportingStep 6

Página 7

NNN-NNN r001 Enecsys Gateway Guide 15Table 1. Gateway default view functional areasArea Description1Status Bar: General information Displ

Página 8

16 Gateway Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com• To access alternate views, use the touch cont

Página 9 - • 1 Enecsys Gateway

NNN-NNN r001 Enecsys Gateway Guide 17Figure 9. Inverter SettingsFigure 10. Gateway SettingsFigure 11. Repeater SettingsThis screen is rea

Página 10 - 3.2. Connecting the gateway

18 Gateway Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comFigure 12. Server SettingsFigure 13. Maintenance

Página 11 - ETHERNET

NNN-NNN r001 Enecsys Gateway Guide 19!ATTENTIONAfter the installation is complete, the gateway should be returned to the default view and

Página 12 - Step 1. Choose language

2 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comContentsChapter 1 Important S

Página 13 - Step 4. Set date and time

20 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comChapter 5 Using Enecsys Rep

Página 14

NNN-NNN r001 Enecsys Installation and Operation Guide 215.3. Installing one or more single repeatersGATEWAY5V DC5V DCFigure 16. Enecsys R

Página 15 - Navigate to:

22 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com5.4. Mounting the single re

Página 16

NNN-NNN r001 Enecsys Installation and Operation Guide 23 C The communication check symbol.Figure 20. Enecsys Gateway Default ViewIf the

Página 17 - Figure 11. Repeater Settings

24 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comChapter 6 Installation• Us

Página 18 - This screen is

NNN-NNN r001 Enecsys Installation and Operation Guide 25Weatherproof Cap FemaleTCable End CapCable JoinerOptionalField Installable Connect

Página 19 - ATTENTION

26 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com6.3. ConnectionsT-Cabling Sy

Página 20 - 5.2. Using Repeaters

NNN-NNN r001 Enecsys Installation and Operation Guide 27Repeat steps 1 and 2 until the desired number of branches is assembled. Terminate

Página 21 - Figure 16. Enecsys Repeater

28 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.coma) Strip cable jacket 18

Página 22 - Figure 18

NNN-NNN r001 Enecsys Installation and Operation Guide 29b) Insert the cable through the sealing nut, seal/clamp ring, and housing for each

Página 23

NNN-NNN r001 Enecsys Installation and Operation Guide 3Step 1: Input the installation owner’s details. ...

Página 24 - Chapter 6 Installation

30 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comChapter 7 Monitoring Setup

Página 25

NNN-NNN r001 Enecsys Installation and Operation Guide 31Setup 2: Enter installation site details.• The Installation Name is used to ident

Página 26 - WARNING:

32 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comStep 5: Begin layout by addin

Página 27 - Weatherproof Cap Female

NNN-NNN r001 Enecsys Installation and Operation Guide 33Step 7: Adjust section layout.• Double-clicking on the section will allow the use

Página 28 - 6.3.2. Cable Joiner

34 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comInstallation Layout Tools Key

Página 29

NNN-NNN r001 Enecsys Installation and Operation Guide 35• The SERIALS tab allows the user to manually load the inverter serial numbers, o

Página 30

36 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com• The installer will need to

Página 31

NNN-NNN r001 Enecsys Installation and Operation Guide 37Step 4: Inform the customer of new user account.• Click the NEW USER button for t

Página 32 - Section Details

38 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comChapter 8 TroubleshootingCo

Página 33

NNN-NNN r001 Enecsys Installation and Operation Guide 398.3. MonitoringProblem SolutionThe installation cannot be set to “live” on the mo

Página 34

4 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comChapter 1 Important Safety In

Página 35

40 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.comChapter 9 PV module/micro i

Página 36

NNN-NNN r001 Enecsys Installation and Operation Guide 51.3. Conventions used in this manualThe following conventions are used throughou

Página 37

6 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com!ATTENTIONThe gateway and repe

Página 38 - Chapter 8 Troubleshooting

NNN-NNN r001 Enecsys Installation and Operation Guide 7Chapter 2 Installation Recommendations2.1. Site requirements for Enecsys micro i

Página 39 - 8.3. Monitoring

8 Installation and Operation Guide Enecsys LLC • 275 Redwood Shores Drive • Redwood Shores, CA 94065 • www.enecsys.com2.5. Connect the AC Cabling t

Página 40 - Example :

NNN-NNN r001 Enecsys Installation and Operation Guide 9Chapter 3 Installing the GatewayGATEWAYROUTER5V DC5V DCETHERNET CABLEFigure 1. En

Comentários a estes Manuais

Sem comentários